Railway Connection 2572, Grünwald Bridge over the Isar River

Completion

2001

Client

Staatliches Bauamt München

Task

Replacement

Building Type

Road bridge

Building Location

Grünwald / Pullach, südlich von München

Building Name

Grünwald Bridge over the Isar River

Building Technique

Temporary accommodation frame, lateral launching, lifting / assembly of prefabricated parts

Building Construction Creative Consulting

Schultz-Brauns & Reinhart Architekten und Stadtplaner BDA, München

Building Material Superstructure

Steel composite

Building Material Foundation

Reinforced concrete

Building Area Size 2.675,00 m²
Building Overall Length 214,00 m
Construction Height 7,08 m
Construction Width 13,30 m
Supporting Structure Type

Arch with suspended deck

Support

Abutment, Pillars / Columns

Distance Between Supports

37 m + 70 m + 70 m + 37 m

Foundation

Shallow foundation, drilled pile foundation

Services: Planning

Competitions

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Construction Planning

Preparation of Tendering

Assistance for Tendering

Structural Analysis

Construction Drawings

Visualisation

Competition Result

1st Award

In Working Group with