Railway Bridge, Replacement, Emden

Montage Zeitraffer Kamera1

Montage Zeitraffer Kamera 2

Completion

2016

Client

Bau- und Entsorgungsbetriebe Emden (BEE)

Task

Replacement

Building Type

Railway bridge

Building Location

Emden

Building Name

Railway Bridge

Building Technique

Incremental launching

Building Material Superstructure

Steel

Building Material Foundation

Reinforced concrete

Building Area Size 800,00 m²
Building Overall Length 78,10 m
Construction Height 8,55 m
Construction Width 10,30 m
Supporting Structure Type

Truss

Support

Abutment

Distance Between Supports

67.00 m

Foundation

Deep foundation

Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Construction Planning

Preparation of Tendering

Assistance for Tendering

Structural Analysis

Construction Drawings

Services: Supervision

Welding Examination

Production and Quality Monitoring

Consultant Services for the Client

Static Constructive Checks

Dr.-Ing. Andreas Schneider