Railway Connection 2124, Plattling Ost Bypass - Bridge over the Isar River

Completion

In progress

Client

Staatliches Bauamt Passau, Servicestelle Deggendorf

Task

New construction

Building Type

Road bridge

Building Location

Plattling

Building Name

Plattling Ost Bypass, Bridge over the Isar

Building Material Superstructure

Steel composite

Building Material Foundation

Reinforced concrete

Building Area Size 6.717,00 m┬▓
Building Overall Length 606,20 m
Construction Height 1,60 m
Construction Width 12,00 m
Supporting Structure Type

Arch with elevated deck

Support

Abutment and pillars / columns

Distance Between Supports

37.09 m + 5 x 41.43 m + 10.36 m + 145.00 m + 10.36 m + 4 x 41.43 m + 30.52 m

Foundation

Drilled pile foundation

Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Construction Planning

Structural Analysis

Construction Drawings

Visualisation

Services: Supervision

Construction Management

Construction Supervision

Production and Quality Monitoring

Consultant Services for the Client

Static Constructive Checks

Prof. Dr.-Ing. Christian Seiler, Dipl.-Ing. Thilo Weischedel