Altstadtringtunnel Section Northwest, Maintenance, Munich

Completion

In progress

Client

Landeshauptstadt München, Baureferat

Task

Maintenance

Building Type

Road tunnel

Building Location

München

Building Name

Altstadtringtunnel

Building Technique

Dig-and-cast method

Building Material

Reinforced concrete, prestressed concrete

Building Overall Length 709,00 m
Construction Width 32,00 m
Services: Planning

Basic Assessment

Preliminary Design

Detailed Design

Planning for Approval

Construction Planning

Preparation of Tendering

Building Information Modelling

Services: Verification

Calculations

In Working Group with