Motorway A7, 6-/8-lane extension

Year of completion

In progress

Type of intervention

Enlargement

Contracting authority

DEGES

Client

Bundesrepublik Deutschland

Description

Extension of the A7 in both directions with one additional lane in two of three planning sections with a length of 4.30 km in section Schnelsen and 3.15 km in section Othmarschen. Two variants were analysed during the design phase for both planning sections: "Required Noise Protection" and "Optimal City Development". In the solution "Required Noise Protection" noise protection walls are exchanged by tunnels. This solution includes one noise protection tunnel with a length of 550.00 m and approximately 7.00 km noise protection walls, the new construction of two undercrossings and two culverts as well as one abutment backup. traffic sign bridges allow the installation of a traffic control system. The section Othmarschen includes a noise protection tunnel with a length of 2.00 km, one solid gallery with a length of 220.00 m, 430.00 m overhead noise barrier for the ramps of exit Bahrenfeld, 1.60 km noise protection walls, two pedestrian walks and traffic sign bridges. The service was completed by the planning of the road illumination for all three sections.

Location

Hamburg

Architect

Lang Hugger Rampp, München

Services Grassl

Basic assessment, preliminary design, detailed design, planning for approval, preparation of tendering, static constructive checks: Dipl.-Ing. Holger Cordes, health and safety coordination, verification analysis, technical examination, economic efficiency calculation , visualisation

Services provided by engineering consortium