Motorway A281, phase 1 and 2 of section 2 and phase 1 of section 3

Year of completion

2008

Type of intervention

New construction

Contracting authority

DEGES

Client

Bundesrepublik Deutschland

Description

New construction of a 3.3 km motorway section with two connections in phase 1 of section 2 including 22 constructions, 4.245 km noise protection walls on free tracks and on structures as well as 29 traffic sign bridges. The structures include elevated roads (length 1,122.00 m and 618.00 m), 13 crossovers (length from 5.30 m to 52.70 m), one cable stayed bridge (maximum span 127.00 m), one bowstring railway bridge (length 48.90 m), three supporting walls (length from 88.50 m to 104.10 m), one wall (total length 831.00 m) and one lock construction in the Neuenlander Wasserlöse. The traffic sign bridges are partially located in phase 1 of section 3 and the 618.00 m elevated road is located in phase 2 of section 2.

Location

Bremen

Architect

BauManagement Bremen und Architekten Gert Schulze BDA, Bremen

Services Grassl

conceptual design, structural design

Preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering