Year of completion
2008
Type of intervention
New construction
Contracting authority
DEGES
Client
Bundesrepublik Deutschland
Description
New construction of a 3.3 km motorway section with two connections in phase 1 of section 2 including 22 constructions, 4.245 km noise protection walls on free tracks and on structures as well as 29 traffic sign bridges. The structures include elevated roads (length 1,122.00 m and 618.00 m), 13 crossovers (length from 5.30 m to 52.70 m), one cable stayed bridge (maximum span 127.00 m), one bowstring railway bridge (length 48.90 m), three supporting walls (length from 88.50 m to 104.10 m), one wall (total length 831.00 m) and one lock construction in the Neuenlander Wasserlöse. The traffic sign bridges are partially located in phase 1 of section 3 and the 618.00 m elevated road is located in phase 2 of section 2.
Location
Bremen
Architect
BauManagement Bremen und Architekten Gert Schulze BDA, Bremen
Services Grassl
conceptual design, structural design
Preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering