Motorway A281, phase 1 and 2 of section 2 and phase 1 of section 3

Year of completion

2008

Type of intervention

New construction

Contracting authority

DEGES

Client

Bundesrepublik Deutschland

Description

New construction of a 3.3 km motorway section with two connections in phase 1 of section 2 including 22 constructions, 4.245 km noise protection walls on free tracks and on structures as well as 29 traffic sign bridges. The structures include elevated roads (length 1,122.00 m and 618.00 m), 13 crossovers (length from 5.30 m to 52.70 m), one cable stayed bridge (maximum span 127.00 m), one bowstring railway bridge (length 48.90 m), three supporting walls (length from 88.50 m to 104.10 m), one wall (total length 831.00 m) and one lock construction in the Neuenlander Wasserlöse. The traffic sign bridges are partially located in phase 1 of section 3 and the 618.00 m elevated road is located in phase 2 of section 2.

Location

Bremen

Architect

BauManagement Bremen und Architekten Gert Schulze BDA, Bremen

Services Grassl

Preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering