![](assets/images/5/c3e3afe0-1dce-4825-8cd7-75d2e0295046-e910aa4b.jpg)
Year of completion
2008
Type of intervention
New construction
Contracting authority
DEGES
Client
Bundesrepublik Deutschland
Description
New construction of a 3.3 km motorway section with two connections in phase 1 of section 2 including 22 constructions, 4.245 km noise protection walls on free tracks and on structures as well as 29 traffic sign bridges. The structures include elevated roads (length 1,122.00 m and 618.00 m), 13 crossovers (length from 5.30 m to 52.70 m), one cable stayed bridge (maximum span 127.00 m), one bowstring railway bridge (length 48.90 m), three supporting walls (length from 88.50 m to 104.10 m), one wall (total length 831.00 m) and one lock construction in the Neuenlander Wasserlöse. The traffic sign bridges are partially located in phase 1 of section 3 and the 618.00 m elevated road is located in phase 2 of section 2.
Location
Bremen
Architect
BauManagement Bremen und Architekten Gert Schulze BDA, Bremen
Services Grassl
Preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering
![](assets/images/5/52165c6c-c3de-4239-9e5d-2b02d82e89c5-4df32421.jpg)
![](assets/images/1/a626827e-069d-44e8-95f3-1fbf7af44120-ad6ba34f.jpg)
![](assets/images/5/ee79b608-597e-4498-939f-12165b87a8de-29739021.jpg)
![](assets/images/0/6133f5f8-8fa3-4837-a53c-cad5ab082a47-eaac6a30.jpg)
![](assets/images/8/3a59f51a-3d58-4e99-8c21-62779cbf462d-084239bc.jpg)