Year of completion
In progress
Type of intervention
Maintenance
Contracting authority
Landeshauptstadt München
Location
Munich
Type of structure
Road tunnel
Construction method
Milan method
Total length
709,00 m
Construction width
32,00 m
Construction material
Prestressed concrete, reinforced concrete
Services Grassl
Basic assessment, preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, conceptual design of traffic infrastructure, verification analysis, expert report, building information modelling, monitoring
Services provided by engineering consortium