Year of completion
1975
Type of intervention
New construction
Contracting authority
Freie und Hansestadt Hamburg
Description
Cable stayed bridge with two steel pylons and a total length of 520.00 m. 80 mm cables in two layers with diameters of 85 and 118 mm. The connected side spans are pre-stressed concrete structures.
Location
Hamburg
Type of structure
Road bridge
Construction method
Cantilevering
Construction material of superstructure
Prestressed concrete, reinforced concrete, steel
Total length
3.618,00 m
Type of structural system
Cable-stayed bridge
Construction height
3,50 m
Construction width
17,60 m
Architect
Architekt Jux
Services Grassl
Preparation of tendering, assistance for tendering, static constructive checks: Ingenieurbüro Grassl GmbH