Bridge across the Regnitzgrund

Year of completion

In progress

Type of intervention

New construction

Contracting authority

Zweckverband Stadt-Umland-Bahn

Location

Erlangen

Type of structure

Road and railway bridge

Construction method

Lifting / assembly of prefabricated parts

Construction material of superstructure

Reinforced concrete, steel, steel composite

Total length

1.434,50 m

Type of structural system

Deck bridge

Span lengths

24+35+50+65+68+50,5+39+30x34+32+29,5+21,5

Construction height

1,20 - 2,00 m

Construction width

11,69 m

Architect

Firmhofer und Günther Architekten

Services Grassl

Basic assessment, preliminary design, detailed design, planning for approval, construction planning, preparation of tendering, assistance for tendering, construction management, visualisation, building information modelling

Latest news about the project

Article on the public transport bridge in the Regnitz Valley

At the 22nd Symposium Brückenbau (Bridge Construction Symposium) in Leipzig on 15 and 16 February 2022 ...

Design of the bridge over the Regnitzgrund in Erlangen

"Three towns. One tramway. The StUB." The tram system for the metropolitan region, the Stadt-Umland-Bahn (StUB) ...