News

NEWS: WHAT'S HAPPENING AT GRASSL

As usual, a lot and everything at the same time. With roughly 700 projects per year things never get boring: Structures are put into operation, construction projects introduced or design competition entries presented. Take a look behind the scenes.

U81 city rail line

Company outing to the major project

The first construction phase of the new U81 city rail line, which will connect Düsseldorf Airport to the urban city rail network, is currently under construction ...

14th Fachtag Brückenbau

Lectures and site visit in Duisburg

The 14th Fachtag Brückenbau (Bridge Construction Symposium) took place yesterday in brilliant sunshine and a temperature of almost 30 degrees ...

New production plant for SEW Eurodrive

Good construction progress for the 68,000 m2 new build

Driving the world – this is the slogan under which the family firm of SEW Eurodrive GmbH, one of the world-leading specialists in drive and automation technology, operates ...

Sustainable mobility in Franconia

Design of the bridge over the Regnitzgrund in Erlangen

"Three towns. One tramway. The StUB." The tram system for the metropolitan region, the Stadt-Umland-Bahn (StUB) ...

Green light at Lake Constance

Formal opening ceremony and opening to traffic of the Waggershausen Tunnel near Friedrichs

700 metres long, twin-tube cross section, 6,000 metric tons of steel, 34,000 cubic metres of concrete and thousands of square metres of mastic asphalt ...

All systems go in Kolbermoor

Opening of the railway overpass

The replacement of the railway overpass in Kolbermoor has been discussed for decades and is high on the residents’ wish list ...

Plattling bypass opened to traffic

Bypass formally opened by transport minister Kerstin Schreyer

All roads lead to Plattling - and now they lead over a particularly fine new bridge crossing the Isar River ...

Bamberger Straße trough structure in Düsseldorf

Heavy traffic drives through for the first time

At 11.00 p.m. on 29 July, traffic drove through the new water-proof trough in the Bamberger Straße below the DB railway for the first time ...

Site visit to the Mangfall Bridge in Rosenheim

Together on site once more

On 21 July 2021, the Munich office attended a site visit to the Mangfall Bridge in Rosenheim ...

U6 extension to Martinsried

Planning for the new metro section

U6-West is one of the four outer axes of metro lines U3 and U6, which cross Munich’s inner city from south to north ...

Extension of the U2 from Gonzenheim to Bad Homburg

Commission for the construction phase

After having carried out the general planning for the extension of the U5 to München-Pasing and the U6 to Martinsried near Munich ...

Transfer of business from TW+ Thilo Weischedel Ingenieure GmbH to Ingenieurbüro

Intensified collaboration

Since 2015, at the Stuttgart base, TW+ Thilo Weischedel Ingenieure GmbH and Ingenieurbüro GRASSL GmbH have shared a busy office...