News

NEWS: WHAT'S HAPPENING AT GRASSL

As usual, a lot and everything at the same time. With roughly 700 projects per year things never get boring: Structures are put into operation, construction projects introduced or design competition entries presented. Take a look behind the scenes.

Hans Grassl Award 2021

Award ceremony at the Technische Universität Braunschweig

To win the 9th Hans Grassl Award, in the winter of 2020/2021 the civil engineering master’s students …

Bridge over the Regnitzgrund in Erlangen

First prize in design competition

Together with Firmhofer + Günther Architekten und Toponauten Landschaftsarchitekten …

Gottleuba Bridge on the new Pirna bypass

Successful start of the incremental launching process

After the completion of the substructure with its piers of up to 70 m …

VHK Careers Forum for Construction 2021

Munich office participates in the virtual VHK Bau career fair on 12 May 2021

From 10.00 a.m. to 3.00 p.m. on 15 May 2021, the Munich office will participate in the VHK Careers Forum for Construction …

Cantilevered construction with a mountain backdrop

Construction continues on the Mangfall Bridge in Rosenheim

The construction of the superstructure of the Mangfall Bridge in Rosenheim is making big steps forward …

Okavango River Bridge

Closing the gap

The last remaining segment of the steel–concrete composite superstructure of the Okavango River was put into place today …

Niederhafen flood protection structure

Elbpromenade receives international recognition

In February, an article on the Niederhafen flood protection structure was published in the Japanese journal …

German Bridge Construction Prize 2020

Michael Borowski receives award for the Rethe Bridge

On 8 March 2021, the Federal Chamber of Engineers and the German Association of Consulting Engineers (VBI) recognised the winning teams …

Award ceremony for the German Bridge Construction Prize

Visit us at stand A46

On 8 and 9 March 2021, GRASSL is participating in the Dresden Bridge Construction Symposium …

Nikolai River Barrier

Nikolaifleet Canal opened to shipping

On 23 February 2021 the Nikolaifleet canal was opened to shipping after comprehensive remedial maintenance …

IKOM Bau 2021

Participation by the Munich office in the career fair at Technical University of Munich

On 2 February 2021 from 9.00 a.m. to 3.00 p.m., the Munich office is participating in IKOM Bau …

Datteln bypass

Floating of the steel superstructure

On the weekend of 11 to 13 December 2020, the steel superstructure of the bridge …