NEWS: WHAT'S HAPPENING AT GRASSL
As usual, a lot and everything at the same time. With roughly 700 projects per year things never get boring: Structures are put into operation, construction projects introduced or design competition entries presented. Take a look behind the scenes.

South-eastern bypass in Münster
Continuous south-eastern bypass in Münster will become reality
To create an end-to-end south-eastern bypass in Münster, the existing section of the B51 will be widened and a new section of the B481 will be built to connect it to the north.
Read more … South-eastern bypass in Münster
BIM lecture at the HM University of Applied Sciences
We prepared future civil engineers for the digital future!
Last week, our BIM manager, Alexander Wellenhofer, held a guest lecture on “BIM in infrastructure engineering – implementation in practice” at the HM University of Applied Sciences in Munich.
Read more … BIM lecture at the HM University of Applied Sciences
Karrieretag Bauwirtschaft Berlin career fair
Exciting exchange with students
Yesterday, we attended the Karrieretag Bauwirtschaft Berlin career fair and exchanged views with students about the various career options in civil engineering.
Read more … Karrieretag Bauwirtschaft Berlin career fair
SBIM User Day
Conducted by SOFiSTiK AG
Last week, we had the opportunity to take part in the inspiring first SBIM User Day of SOFiSTiK AG in Nuremberg.
Read more … SBIM User Day
Renovation of Zossen train station
Goal: Accessibility and line speed increase
As part of the upgrade to increase the speed of the Berlin–Dresden line to 200 km/h, the Zossen train station will be modernised into an accessible train station.
Read more … Renovation of Zossen train station
sustainability
GRASSL is becoming more and more sustainable
We are pleased to announce that all our offices and our fleet are using real green power as of now!
Read more … sustainability
Referendum
A double YES to Regnitz Bridge and Manching!
We are very happy about the outcome of the two referendums: a double YES to the Stadt-Umland-Bahn tramway in Erlangen and to the second bridge over the Paar River in Manching!
Read more … Referendum

Project Days 2024
Exciting presentations, workshops and exchange
At the Project Days on Thursday 6 and Friday 7 June, knowledge was shared through presentations and workshops, and interesting insights into the work of colleagues of other offices and into other topics were gained.
Read more … Project Days 2024
Presentation in Aachen
at the Faculty of Civil Engineering
On 14 May 2024, our Düsseldorf colleagues, Maria Schartner, M.Eng., and Isabel Thelen, M.Sc., held a presentation on the Theodor Heuss Bridge at the Faculty of Civil Engineering of RWTH University in Aachen.
Read more … Presentation in Aachen

Cutting of the first sod of the new building
THW-Ortsverbands Kirchheim
On 17 May, we set out full of anticipation, despite the inclement weather, because we accepted an exciting new construction project: the current building of the THW local section Kirchheim.

GRASSL at the highest German bridge
High-flying team adventure
On 24 May, we visited the highest German railway bridge: the Müngsten Bridge at Solingen. We started from the valley and made our way through the bridge arch to the top and back again.
Read more … GRASSL at the highest German bridge
GRASSL at a conference at TUHH
Digitalisierung des Bauwesens
On 8 May 2024, we were at the Hamburger Bautag (Hamburg Construction Day) at the Hamburg University of Technology (TUHH) and talked with students about the future of the construction industry.
Read more … GRASSL at a conference at TUHH